Thursday, February 28, 2008

Snowing in the house.

Fig 1 - Tuesday night after work I was greeted with this sight - Christmas wonderland!

Fig 2. Wednesday evening I came home to this.

The last few days have been awful, the house was covered in a layer of fine white dust. Big and Little Luis sanded the mud for a tight and smooth museum finish. The walls look much better now, previously the walls and ceiling had a horrible texture application.

Fig 3. The rickety staircase is still up, the new one has not arrived yet.

The appliances arrived today, the build is moving quickly ahead. Even the kitchen cabinet fuck-up is being fixed (it was my fuck-up, I need to proof plans more carefully in the future). I must admit, our contractor is a great guy. His easy temperament, professionalism, good sense of design and ability to give me the bottom line has made this re-model relatively painless. He never goes into specifics unless I ask for them. All I need to know is if it can be done and the costs involved.

Fig 4. The kitchen has been put back together - the lid, electrical, plumbing, pony wall, ventilation.

In addition, Steven and his extended family are fantastic carpenters, plumbers, electrician, HVAC and drywallers. Another telling sign is the bathroom, they always clean up after themselves. Other contractors (i.e., Chad) make a mess in there (missing the toilet, pouring plastering mud down the toilet etc ...).

Fig 5. The appliances in the garage.